Plant Manager
IQE PLC · Spokane, WA
- Level
- Manager
- Team
- Production
- Degree
- Preferred
- Experience asked
- 10+ years
- Industry
- Industrial
- Posted
- Recently
The role in 30 seconds
A management production role at IQE PLC (industrial) in Spokane, WA.
- They ask for
- 10+ years · degree preferred
- Tools it names
- Lean, Six Sigma, SPC, Casting, EHS / safety
- Day to day
- some off-shift / weekend coverage
Read from the posting. The full description is below.
From the plant jobs report · week of October 19, 2026
Production Engineer roles in Washington: typical posted base $120k–$175k.
Median of the low and high ends of 19 live postings that list pay, out of 31 production engineer openings in Washington, read from manufacturers' own careers sites.
Washington plant jobs report →Pay by team and state →What moves pay →
How this role compares
Against 30 other live production postings in Washington.
- Base pay
- Not listed in this posting
- Experience asked
- More than usual (10+ vs 5+)
Typical $120k–$175k, from 18 postings that list pay.
Similar roles usually ask 5+ years.
Skills these teams ask for most
- Python 39%
- Root cause 29%
- Team leadership 26%
- ✓ Lean 26%
- New product launch 23%
✓ = this posting asks for it too. % = share of similar postings that mention it.
Stands out: this posting asks for SPC, Casting, which few similar roles mention. If you have it, lead with it.
At a glance
Pulled from the posting text. If it's not listed here, the posting didn't say.
How to get in at this plant
Five moves over a week or two. The first one takes ten minutes.
- 1
Pick 2–3 people on the Production team at IQE PLC
Engineers who joined in the last year or two reply the most. Use the team search on this page to find them.
- 2
Send a short, curious note
One real question about their work. No favors yet. Each person gets a different note, written for this role.
- 3
Turn a reply into a short call
Questions worth asking about this team:
- What does a normal week look like on your team?
- How does off-shift and weekend coverage work?
- How did you land the job? What stood out in your interviews?
- 4
Apply with someone vouching for you
If the call went well, ask whether they’d pass your résumé to the hiring manager. Send your résumé link, apply that day, and let them know.
- 5
Bring proof to the interview
One page of before-and-after numbers from projects you led: scrap, OEE, cycle time, cost. Plant managers hire on results.
Full description from IQE PLCAs posted on their careers site.ShowHide
Full description on IQE PLC's site ↗
