Manufacturing Facility & Industrial Engineer
Snowcap Compute · Jacksonville, FL
- Level
- Engineer
- Team
- Industrial
- Industry
- Industrial
- Posted
- Recently
The role in 30 seconds
An engineer-level industrial role at Snowcap Compute (industrial) in Jacksonville, FL. Lead industrial engineering planning for the phased Snowcap manufacturing facility build-out — product flow, equipment layout, cleanroom zoning, and the phase-by-phase sequencing that makes the capital plan executable.
- Tools it names
- Capacity planning, MES
Read from the posting. The full description is below.
From the plant jobs report · week of October 26, 2026
Industrial Engineer roles in the US: typical posted base $86k–$125k.
Median of the low and high ends of 72 live postings that list pay, out of 276 industrial engineer openings in the US, read from manufacturers' own careers sites.
Florida plant jobs report →Pay by team and state →What moves pay →
How this role compares
Against 275 other live industrial postings in the US.
- Base pay
- Not listed in this posting
- Experience asked
- Not stated
Typical $86k–$125k, from 71 postings that list pay.
Similar roles usually ask 5+ years.
Skills these teams ask for most
- Lean 62%
- Time studies 43%
- New product launch 37%
- Six Sigma 37%
- AutoCAD 28%
- Root cause 27%
✓ = this posting asks for it too. % = share of similar postings that mention it.
At a glance
Pulled from the posting text. If it's not listed here, the posting didn't say.
How to get in at this plant
Five moves over a week or two. The first one takes ten minutes.
- 1
Pick 2–3 people on the Industrial team at Snowcap Compute
Engineers who joined in the last year or two reply the most. Use the team search on this page to find them.
- 2
Send a short, curious note
One real question about their work. No favors yet. Each person gets a different note, written for this role.
- 3
Turn a reply into a short call
Questions worth asking about this team:
- What does a normal week look like on your team?
- Is it more layout and capacity work, or time studies and standard work?
- How did you land the job? What stood out in your interviews?
- 4
Apply with someone vouching for you
If the call went well, ask whether they’d pass your résumé to the hiring manager. Send your résumé link, apply that day, and let them know.
- 5
Bring proof to the interview
One page of before-and-after numbers from projects you led: scrap, OEE, cycle time, cost. Plant managers hire on results.
Full description from Snowcap ComputeAs posted on their careers site.ShowHide
About the Role
Snowcap is moving into the facility build-out phase of its manufacturing program: roughly 450,000 square feet, an approximately $1B capital plan, built in phases over the next decade, with the Jacksonville site as the initial deployment. The industrial engineering for that — product flow, equipment layout, cleanroom zoning, throughput modeling, capacity planning — is not yet someone's job at Snowcap. It becomes yours.
You will lead the industrial engineering planning for the phased build-out: define and optimize product flow, material handling, and equipment layout; develop manufacturing capacity and space utilization models by phase; and produce the manufacturing process flow documentation that turns superconducting chip fabrication at scale into a runnable line. You will work directly with construction management, MEP engineers, and equipment vendors on the build side, with the operations software team on digital factory and MES planning, and with fab technology and physics on what the process actually needs from the facility. We are a flat, matrixed organization — the decisions are yours to drive.
In twelve months, the phased buildout plan you produce should be the artifact every capital decision, every equipment procurement conversation, and every layout review at Snowcap runs through. The discipline you establish around capacity modeling, throughput planning, and process flow documentation becomes the baseline every future industrial engineer at Snowcap inherits.
requirements
the facility has to meet, and the sequencing that minimizes rework as phases land.
- ✓Partner with the operations software team on digital factory and MES planning — what the floor needs to instrument, what data has to be captured, and what decisions the system has to support.
- ✓Stand up the initial deployment in Jacksonville and use it as the proof point and template for everything that follows.
- ✓Set the standard at Snowcap for how manufacturing facility and IE planning is done — the documentation, the modeling, and the decision artifacts the next engineer in this seat inherits.
requirements
that cleanroom and cryogenic operations actually demand.
- ✓Demonstrated ability to operate across disciplines — construction management, MEP, equipment procurement, operations software — without losing the technical thread on any of them.
- ✓Strategic planning ability across a multi-year, multi-phase roadmap, combined with the discipline to execute near-term phase milestones without losing the long view.
requirements
that transfer to a superconducting fab context.
- ✓Operations research or industrial engineering consulting background where you owned the IE side of a large capital equipment facility project end to end.
- ✓Hands-on experience modeling capacity, throughput, and bottleneck analysis in tools that go beyond spreadsheets — discrete-event simulation, factory simulation packages, or equivalent.
- ✓Working familiarity with MES, factory data systems, and the integration between IE planning and the digital factory layer.
- ✓Experience with cryogenic, ultra-high-vacuum, or other non-standard cleanroom utility environments — anything that proves the facility envelope can stretch past commodity fab assumptions.
- ✓Track record of published or internal IE methodology — capacity models, layout standards, or planning playbooks that other teams have adopted.
The Environment
Snowcap is a small, technically elite team standing up a manufacturing facility for a process that has not been run at this scale anywhere. There is no inherited fab planning playbook to copy from — the existing semiconductor IE conventions translate partially, and the parts that do no
Show full description ↓Show less ↑
Snowcap is building an approximately 450,000 square foot superconducting chip manufacturing facility in phases over the next decade. You will own the industrial engineering of how that facility actually runs — product flow, capacity, equipment layout, and the phase-by-phase plan that turns a billion-dollar build into a working production line.
What You'll Own
- •Lead industrial engineering planning for the phased Snowcap manufacturing facility build-out — product flow, equipment layout, cleanroom zoning, and the phase-by-phase sequencing that makes the capital plan executable.
- •Define and optimize product flow, material handling, and WIP movement across the floor — including the constraints that superconducting and cryogenic process steps impose on layout.
- •Develop manufacturing capacity models and space utilization plans by phase — what each phase produces, what it needs to operate, and what tradeoffs the next phase makes.
- •Own the manufacturing process flow documentation for superconducting chip fabrication at scale — the artifact equipment, facilities, and operations all align to.
- •Coordinate with construction management, MEP engineers, and equipment vendors on the technical
What We Need to See
- •Industrial or manufacturing engineering background applied at scale — a semiconductor fab, advanced electronics manufacturing, or comparable precision manufacturing environment where your IE work shaped real layouts and real throughput.
- •Direct experience planning or executing large-scale cleanroom or precision manufacturing facility build-outs, including the phasing decisions that determine whether the schedule and capital plan hold.
- •Strong process flow and capacity modeling skills — equipment, WIP, throughput, cycle time, and the ability to defend a model under capital-decision pressure.
- •Working knowledge of the facilities envelope: HVAC, vibration isolation, electrical, gas distribution, and the utility
Ways to Stand Out
- •Fab planning or industrial engineering background at Intel, TSMC, GlobalFoundries, Samsung, or comparable semiconductor manufacturers — particularly programs where you executed a phased facility plan from green-field to production.
- •Aerospace or defense manufacturing facility planning experience with cleanroom or precision-environment
